· SERENPET MCLEOD 9-30 NEW COMPRESSOR INSTALLATION
Full EPCM project to install refurbished 1200 HP Compressor IR-2HOSWA-7042GSI EFX Driver. Compressor was to de-bottleneck gas gathering system. Facility designed for 35 MMSCFD (150 psia suction to 1200 psia discharge)
· PETROMET FOXCREEK GAS PLANT REVAMP AND 40 KM PIPELINE/GATHERING SYSTEM
Installed inlet separator/pump and compressor to process additional gas. Total cost for pipeline and facilities was approximately $6.5 million.
· PETROMET PEACE RIVER COMPRESSOR INSTALLATION
Relocated 1000 HP – 4 throw – 2 stage compressor unit to handle 6-8 MMSCFD of sweet gas from Highvale to Peace River, Project comprised of: PLC, dehy unit, metering skids and office/MCC building. Total cost of project was $1.7 million.
· PETROMET HIGHVALEE COMPRESSOR STATION
New CAT. 3406 JA/Ariel JGA-2 215 BHP compressor installation. Project included replacing unit, foundation modifications, pipe rack extension and instruments/controls modifications. Total cost was $1 million.
· CABRE EXPLORATION LTD. SHALLOW GAS COMPRESSION
Installed four Screw Booster Compressors at different locations. The booster were modularized to ease installation. They all included total spill containment and fire & gas detection shutdown & blowout.